Averbrook Condo and co-op questionnaire desk

A finished package

Clean

Every check passed. This is the package as it arrives: the completed questionnaire, then the review that stands behind it. Your manager reads it, signs it, and sends it.

Download the completed Fannie 1076 / Freddie 476 Download the full package with the review

The form is what your manager signs, and the building safety addendum rides with it, completed the same way. The package shows the arithmetic and the source behind every answer on both. Every condominium order arrives as all three.

Condominium Project Questionnaire (Full), draft

SAMPLE - FICTIONAL COMMUNITY

Harborview Commons Condominium, Tampa, FL (84 units)

Form basis
Fannie Form 1076 / Freddie Form 476 (Dec 2021) plus Addendum 1076A/476A; block map is content-verified, form numerals are not
Regime
Full Review regime for applications dated on or after 2026-08-03 (LL-2026-03)
Application date
2026-08-11
Prepared by
Averbrook, package standard v1.0.0; rules compiled 2026-08-11 from published Fannie Mae and Freddie Mac guidance

Draft prepared from association-provided data for the management company's review and signature. The management company is the preparer and signer of record. Informational only: no legal advice, no statutory interpretation. Every package is checked against the agency requirements before delivery.

C1. Basic project information

Project legal name
Harborview Commons Condominium
Address
2500 Shorebird Lane, Tampa, FL 33611
HOA name
Harborview Commons Condominium Association, Inc.
HOA EIN
59-1234567
Management company
Gulfgate Community Management, LLC
Total units
84
Units sold/conveyed to unit purchasers
84 of 84 units (100.0%)
Year built / converted
2004
Part of a master association or larger development
No

C2. Project completion status

All units and common elements complete
Yes
Additional phasing or annexation planned
No
Completion answered from (recorded declaration)
Declaration of Condominium recorded 2004 (Hillsborough County OR Book 13xxx, fictional) and amendments through 2019; no phases reserved
Declaration reserves annexation/expansion rights
No
HOA control turned over to unit owners
Yes (2006)
Conversion details
Not a conversion
Established-project status (section A)
Established: 84 of 84 units conveyed (100%), complete, no additional phasing, control turned over (B4-2.1-01 definition)

C3. Occupancy counts

Owner-occupied (principal residence)
61 of 84 units (72.6%)
Second homes
12 of 84 units (14.3%)
Investor-owned
11 of 84 units (13.1%)
Source of counts
Per association records: homestead-exemption match plus owner mailing addresses, as of 2026-08-01
Note
No occupancy concentration requirement for established projects (eliminated 2026-03-18, LL-2026-03); counts reported for the form

C4. Single-entity ownership

Any person or entity owning more than one unit
Yes, itemized below (leased and developer-retained units aggregate)
Investor A (fictional holding company)
3 of 84 units (3.6%), of which 2 leased

C5. Financials and reserves

Budget source (every financial answer dated)
FY2026 budget adopted by the board 2025-11-18
Annual budgeted assessment income (regular)
$604,800
Excludable income still inside that figure (pass-throughs, incidental)
$0
Annual budgeted total income
$612,000
Budgeted replacement-reserve allocation (named line)
$66,528
Reserve allocation as % of assessment income
$66,528 / $604,800 = 11.0% (named replacement-reserve line; special-assessment income excluded from the denominator)
Funded reserve balance
$410,000
Reserve study
Completed 2025-03-10 by Meridian Reserve Advisors (fictional); highest recommended annual allocation $60,000; recommended funded balance $350,000; within 3 years of the application date

C6. Assessment delinquency

Units 60+ days past due, regular assessments
3 of 84 units (3.6%); unit counts, never dollar agings
Units 60+ days past due, special assessments
No special assessments on file; not applicable

C7. Special assessments

Special assessments
None
Special assessments under discussion (not yet adopted)
No; per board meeting minutes September 2025 through July 2026 reviewed; no special assessment discussed

C8. Litigation

Pending litigation
Yes, 1 matter(s), disclosed and classified below
Matter 1
Association v. unit owner 4-207, delinquent-assessment collection action filed 2026-05 in Hillsborough County (fictional docket). Classification: HOA is plaintiff in an assessment-collection or foreclosure action (B13)

C9. Usage and commercial space

Commercial / non-residential share
non-residential 4,200 sq ft / total 88,200 sq ft = 4.8% (by square footage; hotel and rental-apartment space count as commercial)
Commercial sq ft (retail/office/other)
4,200
Hotel sq ft (counts as commercial)
0
Rental-apartment sq ft (counts as commercial)
0
Hotel-type operations
None: no front desk, no daily rentals, no rental pooling, no mandatory rentals, no hotel branding, answered literally
Short-term rentals permitted
No
Non-incidental business income
$0

C10. Restrictions

Right of first refusal
No
Age restrictions
No
Resale restrictions
None reported
Leasehold estate
No
Mandatory third-party memberships
No
Recreational leases
No
Assessment lien priority (B11)
6 months of regular assessments may prime the first mortgage

C11. Insurance

Carrier
Meridian Bay Mutual Insurance Company (fictional)
Carrier rating
AM Best A- (B7-3-01 screen in INS-09)
Policy number
MBM-CP-204418
Expiration
2027-04-01
Coverage amount
$24,150,000 (100% of estimated replacement cost $24,150,000 per insurer replacement-cost valuation dated 2026-03-15)
Replacement-cost evidence
insurer replacement-cost valuation dated 2026-03-15, dated 2026-03-15; coinsurance: none
Policy form
Special (all-risk) form: Yes; replacement-cost loss settlement: Yes; roof settlement: replacement cost
Per-occurrence deductible
$100,000 (0.4% of coverage; limit 5%)
Per-unit deductible
$25,000 per unit (cap $50,000 for applications on or after 2026-07-01); borrower HO-6 policy required: noted
Deductible schedule by peril
all other perils: $100,000, per_occurrence (per dec page, policy MBM-CP-204418 (fictional)); named storm: $25,000, per_unit (per dec page, policy MBM-CP-204418 (fictional))
Deductible buy-back layers
None
Endorsements
insurance trustee recognition: Yes; waiver of subrogation vs unit owners: Yes; master policy primary: Yes; building ordinance: Yes
Boiler and machinery
central HVAC: Yes; boiler and machinery $2,000,000 (lesser of $2M or replacement cost required)
Flood
in SFHA: Yes; flood coverage: Yes $24,150,000
Liability
$1,000,000 per occurrence
Fidelity/crime
$460,000

C12. Financial controls

Separate bank accounts for operating and reserve funds
Yes
Management agreement
Professional management agreement with Gulfgate Community Management, LLC through 2027-12-31
Funds custody
Gulfgate Community Management, LLC as managing agent; accounts titled to the Association
Fidelity coverage for funds custodian
Yes

C13. Building safety addendum (1076A/476A)

Last inspection
2025-06-18, Milestone structural inspection, by Bayline Engineering Group (fictional), licensed professional engineer
Findings and repairs (answered from the report)
Based on the 2025-06-18 Milestone structural inspection by Bayline Engineering Group (fictional), licensed professional engineer: no critical repairs needed, no evacuation orders, no outstanding regulatory actions or violations.
Unfunded repair cost per unit, next 12 months
$0 (B14 trigger: $10,000)
Evacuation orders
No
Regulatory actions / violations
No

C14. Preparer

Prepared by
Dana Whitfield (fictional), Community Association Manager
Relationship to HOA
Employee of Gulfgate Community Management, LLC, managing agent for the Association
Date prepared
2026-08-11
Signature
DRAFT - unsigned. The management company is the preparer and signer of record.

Review

CLEAN 41 pass, 0 to resolve

Every check, all 60 of them, with its result and the rule it comes from
Every check made on this package, with its result and the rule it comes from.
CheckResultWhat the review foundRule
FIN-01-RESERVE-PCT
Reserve allocation percentage
PASS $66,528 / $604,800 = 11.0%, meets the 10% (current) floor B4-2.2 Full Review Process (08/05/2026) [verified]; 15% floor: LL-2026-03 (2026-03-18), applications on or after 2027-01-04 [verified; also Freddie Bulletin 2026-C and 5701.5 (01/04/27 version)]
FIN-02-RESERVE-STUDY
Reserve study substitute
PASS valid substitute available: study dated 2025-03-10 (within 3 years of application), budget $66,528 funds the highest recommended allocation $60,000 B4-2.2 Full Review Process (08/05/2026) [verified]; highest-recommendation funding and baseline-funding ban, applications on or after 2026-08-03 [verified: LL-2026-03; Freddie 5701.5(d) (08/03/26 version)]
FIN-03-DELINQ-REGULAR
Delinquency, regular assessments
PASS 3 of 84 units (3.6%) 60+ days past due on regular assessments; limit 15% B4-2.2 Full Review Process (08/05/2026) [verified]
FIN-04-DELINQ-SPECIAL
Delinquency, special assessments
PASS no special assessments on file; the special-assessment delinquency test is not applicable B4-2.2 Full Review Process (08/05/2026) [verified]
FIN-05-BUDGET-ADEQUACY
Budget adequacy
PASS assessments established ($604,800 budgeted) with a named replacement-reserve line ($66,528); reserve floor graded in FIN-01; qualitative items to confirm: budget consistent with the nature of the project, line items appropriate to project type and status, adequate funding for insurance deductibles (no formula in the Guide) B4-2.2-02 Full Review Eligibility Requirements (June 3, 2026 guide): budget 'is adequate (that is, it includes allocations for line items pertinent to the type of condo project)' [verified primary]; Freddie 5701.5(b) / 5701.6(c) [verified primary]
FIN-06-RESERVE-DENOMINATOR
Reserve denominator, checked again
PASS $66,528 / ($604,800 - $0 excludable) = 11.0% on the pure denominator; consistent with the stated-figure ratio 11.0% and the claimed 11.0% relative to the 10% (current) floor B4-2.2-02 Full Review Process (04/02/2025, June 3 2026 guide): reserve calculation and its exclusion list (incidental, pass-through utilities, reserve-allocated, special-assessment income) [verified primary]; Freddie 5701.5(b)5 [verified]; condo-approval.com 2025-11-18
FIN-07-DELINQ-NORMALIZER
Delinquency ledger normalizer
PASS ledger 3 of 84 units (3.6%) minus 0 post-transfer stale entries = 3 of 84 units (3.6%) reconciled; aging basis 60 days; ledger and reconciled figures sit on the same side of the 15% limit B4-2.2 Full Review Process (08/05/2026): 15% of units 60+ days past due [verified]; unit counts, never dollars; REO ledger drift [estimate], 60+ aging basis [verified threshold]; note: special assessments are tested separately (FIN-04), not blended into this count
OCC-01-OCCUPANCY
Owner-occupancy concentration
PASS no occupancy concentration requirement for established projects (eliminated 2026-03-18 by LL-2026-03); counts reported for the form LL-2026-03 (2026-03-18), 'Retirement of investor concentration limits', effective immediately [verified]; condotel red flag: B4-2.1-03 (08/05/2026) [verified]
OWN-01-SINGLE-ENTITY
Single-entity ownership limit
PASS largest holder Investor A (fictional holding company): 3 of 84 units (3.6%), including 2 leased (leased and developer-retained units aggregate); within the limit 20.0% for a 21+ unit project B4-2.1-03 Single-Entity Ownership (June 3, 2026 guide) [verified primary: limits, lease-arrangement inclusion, exclusions, purchase waiver; HOA owned-and-rented units count per the Non-Incidental Business Arrangements text]; Freddie 5701.3(j) diverges (25% at 21+ units)
OWN-02-REO-OWNER-OF-RECORD
REO / lender-held owner-of-record
PASS no REO / lender-held / association-foreclosure holdings reported B4-2.1-03 Single-Entity Ownership (June 3 2026 guide) [verified: the exclusion list has no REO/lender entry, so bank- and association-held units count like any owner]; owner-of-record and date-acquired identification [verified form instructions]
NEW-01-PRESALE
New-project presale and completion
PASS not applicable: established project (84 of 84 units conveyed (100%), complete, no additional phasing, control turned over) B4-2.2 additional requirements, new/newly converted projects (08/05/2026) [verified]
LEGAL-01-PHASING-MASTER
Legal phasing and master association
PASS completion answered from Declaration of Condominium recorded 2004 (Hillsborough County OR Book 13xxx, fictional) and amendments through 2019; no phases reserved; no annexation rights reserved; not part of a master association B4-2.1-01 established definition: no additional phasing/annexation [verified]; B4-2.2-03 phased-project guidance and the LL-2026-03 5-10-unit waiver master-association condition [verified rules; budget-blending failure mode estimate]; denominator conventions
LEGAL-02-ROFR
Right of first refusal
PASS no right of first refusal in the project documents B4-2.2-03 Limitations on Ability to Sell/Right of First Refusal (08/05/2026) [verified 2026-08-14]; risk framing B4-2.1-01
CHAR-01-COMMERCIAL
Commercial space share
PASS non-residential (commercial 4,200) = 4,200 sq ft of 88,200 total (4.8%); limit 35% B4-2.1-03 (08/05/2026) [verified]
CHAR-02-CONDOTEL
Hotel/condotel operations
PASS no hotel-type operations reported B4-2.1-03 (08/05/2026) [verified]
CHAR-03-INELIGIBLE-TYPES
Ineligible project types
PASS no ineligible project type reported B4-2.1-03 (08/05/2026) [verified]
CHAR-04-PRIORITY-LIEN
Priority lien exposure
PASS 6 months of regular assessments may prime the lien; limit 6 B4-2.1-01 (08/05/2026) [verified]
LIT-01-DISQUALIFYING
Litigation disqualification screen
PASS all 1 pending matter(s) disclosed and classified within the B13 carve-outs B4-2.1-03 (08/05/2026) [verified]
LIT-02-CLASSIFICATION
Litigation carve-out classification
PASS (1) MINOR: HOA is plaintiff in an assessment-collection or foreclosure action (B13) B4-2.1-03 (08/05/2026) [verified]
LIT-03-COMPLETENESS
Litigation intake completeness
PASS all 1 matter(s) carry proceeding type and the carve-out facts (type, insurer-defending posture, limits vs demand where applicable) B4-2.1-03 litigation carve-outs [verified]; Freddie 5701.3(i) expressly extends the screen to arbitration/mediation [verified]; bare yes/no wrong in both directions; JustAnswer mediation thread [self-reported]
COND-01-CRITICAL-REPAIRS
Critical repairs / deferred maintenance
PASS no critical repairs or significant deferred maintenance reported, and unfunded 12-month repairs are $0 per unit (limit $10,000) B4-2.1-03 (08/05/2026) [verified]
COND-02-EVACUATION
Evacuation order
PASS no evacuation order B4-2.1-03 (08/05/2026) [verified]
COND-03-SA-REMEDIATION
Special assessment remediation
PASS no special assessments on file B4-2.1-03 (08/05/2026) [verified]
COND-04-INSPECTION
Inspection report screen
PASS inspection dated 2025-06-18 (within 3 years): no critical repairs needed, no evacuation orders, no outstanding regulatory actions B4-2.1-03 (08/05/2026) [verified]
COND-05-SA-PURPOSE
Special assessment purpose consistency
PASS no special assessments on file B4-2.1-03 critical repairs / special assessments [verified]; Freddie 5701.3(n): purpose, approval date, original amount, amount remaining, expected payoff for every current and planned assessment [verified]; KSN Law 2024-2025; MEEB: attach the engineer report rather than characterizing it
INS-01-PROPERTY
Master property coverage
PASS coverage $24,150,000 equals or exceeds 100% of estimated replacement cost $24,150,000 per insurer replacement-cost valuation dated 2026-03-15; Special form; replacement-cost loss settlement (roof may be non-RCV) B7-3-03 (fetched 2026-08-11) [verified]
INS-02-DEDUCTIBLES
Deductibles
PASS per-occurrence deductible $100,000 is 0.4% of coverage (limit 5%); per-unit deductible $25,000 (cap $50,000, applications on or after 2026-07-01); borrower HO-6 noted: must cover at least the greater of interior-restoration cost or the per-unit deductible (LL-2026-03) B7-3-03 (fetched 2026-08-11) [cap verified]; $50,000 cap and the 2026-07-01 application-date trigger [verified: LL-2026-03 pp. 5-6]; pre-2026-07-01 standard: B7-3-03 (02/07/2024 version, June 3 2026 guide) [verified primary]
INS-03-ENDORSEMENTS
Endorsements and boiler
PASS trustee recognition, subrogation waiver, and master-primary confirmed; building-ordinance coverage in place; boiler and machinery $2,000,000 meets the lesser of $2M or replacement cost B7-3-03 (fetched 2026-08-11) [verified]
INS-04-FLOOD
Flood coverage
PASS flood coverage $24,150,000 meets the B7-3-06 building floor: at least the lesser of 80% of replacement cost ($19,320,000) or the maximum NFIP coverage per unit; deductible (not an intake field) may not exceed the NFIP RCBAP maximum; verify on the evidence of insurance B7-3-06 Requirements for Project Developments and Deductible Requirements (02/07/2024, June 3 2026 guide) [verified primary]
INS-05-LIABILITY
Liability coverage
PASS liability coverage $1,000,000 meets the B7-4-01 minimum of $1,000,000 per single occurrence; confirm on the evidence of insurance: severability of interests / separation of insureds (or the specific endorsement), coverage of HOA-owned commercial spaces and common-element operations, HOA as named insured with premiums a common expense B7-4-01 (12/14/2022, June 3 2026 guide) [verified primary]; LL-2026-03 B7-4-01 note: only waiver-of-review projects exempt post-2026-08-03
INS-06-FIDELITY
Fidelity/crime coverage
PASS fidelity/crime coverage $460,000 meets the B7-4-02 minimum of $151,200 (three months of assessments on all units ($604,800 x 3/12 = $151,200; financial controls adhered to)); policy covers the management agent's acts B7-4-02 (12/14/2022, June 3 2026 guide) [verified primary]; LL-2026-03 B7-4-01 note: only waiver-of-review projects exempt post-2026-08-03
INS-07-PERIL-DEDUCTIBLES
Per-peril deductible schedule
PASS 2 layer(s) transcribed with peril, basis, application, and source: (1) all other perils: $100,000 = 0.4% of coverage; (2) named storm: $25,000 per unit B7-3-03 Deductible Requirements [verified: 5% of coverage per occurrence, multiple deductibles combine (02/07/2024 version); $50,000 per-unit cap for applications on or after 2026-07-01 (LL-2026-03)]; transcription integrity: peril + basis + application, never a conversion worked out from another figure; exactly-5% base verification; calendar-year hurricane basis per MyFloridaCFO [self-reported]
INS-08-DEDUCTIBLE-BUYBACK
Deductible buy-back disclosure
PASS no deductible buy-back layers reported; base deductibles govern (INS-02, INS-07) B7-3-03 buy-back note (02/07/2024) [verified: acceptable 'provided the policy meets all other property insurance requirements in Chapter B7-3, including insurer rating requirements']; present master deductible, buy-back layer, and net effective; never only the net [self-reported: Merlin Law Group]
INS-09-CARRIER-ELIGIBILITY
Carrier eligibility and FAIR-plan conditionality
PASS master carrier Meridian Bay Mutual Insurance Company (fictional): AM Best A- meets B7-3-01 B7-3-01 (fetched 2026-08-11) [verified: rating test - any one of AM Best B, Demotech A, S&P BBB, KBRA BBB; FAIR/windstorm-pool policies accepted only 'if they are the only coverage that can be obtained at the time of the loan closing or policy renewal']; layered placements screen every participant [self-reported: CondoTek/MGIC 1/15/25]
INS-10-LOSS-SETTLEMENT
Loss-settlement sweep
PASS replacement-cost settlement throughout, roof included; no ACV carve-outs to disclose B7-3-03 with LL-2026-03 [verified: replacement-cost loss settlement required, roofs excepted - roofs must be insured but need not be RCV; ACV acceptable on personal property and certain non-building elements]; HO-6 gap logic: LL-2026-03 HO-6 rules [verified] and PennyMac 26-76
INS-11-RCV-EVIDENCE
Replacement-cost evidence and coinsurance
PASS evidence: insurer replacement-cost valuation dated 2026-03-15, dated 2026-03-15 (149 days before application); no coinsurance clause B7-3-03 acceptable replacement-cost evidence list (guaranteed RC, extended RC, insurer RCV valuation, insurance risk appraisal, qualified statement) [verified: LL-2026-03]; agreed-amount/coinsurance reading and the 12-month FL binding practice: FSResidential 2026 [self-reported]; FL 36-month appraisal statute not fetched - age flags are warnings only; statutory interpretation is not statutes
PROV-01-PROVENANCE
Answer provenance
PASS material answers sourced and dated: occupancy per association records: homestead-exemption match plus owner mailing addresses, as of 2026-08-01; no assessments under discussion per board meeting minutes September 2025 through July 2026 reviewed; no special assessment discussed; financials per FY2026 budget adopted by the board 2025-11-18; lease terms per Declaration art. 14.2 (fictional): leases no shorter than 180 days, no more than twice per year every material answer carries source document plus date; Eisenberg v. Phoenix Association Management (Mass. 2003) via MEEB [verified case, the one litigated loss]; CAMS 'DON'T GUESS' [self-reported]
PROC-01-CPM-STATUS
CPM project status
PASS CPM status: Approved by Fannie Mae (checked 2026-08-10) CPM FAQ (July 2026) Q9 and Q18 plus B4-2.1-02 [verified]
PROC-02-CPM-CERT
CPM certification currency
PASS CPM status confirmed 2026-08-10; certification must remain unexpired and the project eligible as of the note date (lender-side, note date not yet known) CPM FAQ (July 2026) Q9, unexpired certification in file [verified]; review age at note: one year established / 180 days new [verified primary: B4-2.1-01 Expiration for Project Reviews, June 3 2026 guide; Freddie 5701.2(a)(3)]
PROC-03-REGIME
Review regime applicability
PASS application dated 2026-08-11: Full Review regime applies; Limited Review and short-form 1077/477 are retired (D12) LL-2026-03 (2026-03-18), mandatory for applications dated on or after 2026-08-03 [verified primary]
PROC-04-REGIME-ROUTER
Application-date regime router
PASS application dated 2026-08-11 selects: per-unit deductible: $50,000 cap + HO-6 cure (on/after 2026-07-01); review regime: Full Review, Limited Review and short-form 1077/477 retired (on/after 2026-08-03); reserve study: highest-recommendation funding mandatory, baseline method banned (on/after 2026-08-03); reserve floor: 10% (before 2027-01-04); effective-immediately items in force since 2026-03-18: investor-concentration limit retired, inflation-guard retired, roof may settle ACV, waiver expanded to <=10-unit projects LL-2026-03 (2026-03-18) effective-date table [verified: $50K per-unit deductible 2026-07-01; Limited Review retirement and reserve-study rules 2026-08-03; 15% reserve floor 2027-01-04; investor-concentration, inflation-guard, and roof-RCV relief effective immediately]; SEL-2026-07 conform (guide text 08/05/2026); answer to the vintage the application date selects
COOP-01-IRC-216
Section 216 cooperative housing corporation status
N/A co-op standard, not applied to a condominium file B4-2.3-02 Co-op Project Eligibility (05/06/2026) [verified primary, read 2026-08-13]
COOP-02-TITLE
Corporation holds title to the property
N/A co-op standard, not applied to a condominium file B4-2.3-02 Co-op Project Eligibility (05/06/2026) [verified primary, read 2026-08-13]
COOP-03-SHARES
Share structure
N/A co-op standard, not applied to a condominium file B4-2.3-02 Co-op Project Eligibility (05/06/2026) [verified primary, read 2026-08-13]
COOP-04-BLANKET-MORTGAGE
Underlying / blanket mortgage
N/A co-op standard, not applied to a condominium file B4-2.3-02 Co-op Project Eligibility (05/06/2026) [verified primary, read 2026-08-13]
COOP-05-BALLOON
Underlying mortgage balloon terms
N/A co-op standard, not applied to a condominium file B4-2.3-02 Co-op Project Eligibility (05/06/2026) [verified primary, read 2026-08-13]
COOP-06-PER-SHARE-DEBT
Per-share project debt ratio
N/A co-op standard, not applied to a condominium file B4-2.3-03 Legal Requirements for Co-op Projects (11/06/2024) [verified primary, read 2026-08-13]
COOP-07-PROPRIETARY-LEASE
Proprietary lease term
N/A co-op standard, not applied to a condominium file B4-2.3-03 Legal Requirements for Co-op Projects (11/06/2024) [verified primary, read 2026-08-13]
COOP-08-RECOGNITION
Recognition agreement
N/A co-op standard, not applied to a condominium file B4-2.3-03 Legal Requirements for Co-op Projects (11/06/2024) [verified primary, read 2026-08-13]
COOP-09-AUDITED-FINANCIALS
Two years of audited financials
N/A co-op standard, not applied to a condominium file B4-2.3-02 Co-op Project Eligibility (05/06/2026) [verified primary, read 2026-08-13]
COOP-10-CASH-FLOW
Corporate cash flow and reserve adequacy
N/A co-op standard, not applied to a condominium file B4-2.3-02 Co-op Project Eligibility (05/06/2026) [verified primary, read 2026-08-13]
COOP-11-SPONSOR-CASH-FLOW
Sponsor-attributable negative cash flow
N/A co-op standard, not applied to a condominium file B4-2.3-02 Co-op Project Eligibility (05/06/2026) [verified primary, read 2026-08-13]
COOP-12-SOLD-CONVEYED
Shares sold and conveyed to principal residences
N/A co-op standard, not applied to a condominium file B4-2.3-02 Co-op Project Eligibility (05/06/2026) [verified primary, read 2026-08-13]
COOP-13-SPONSOR-CONCENTRATION
Single-entity share concentration
N/A co-op standard, not applied to a condominium file B4-2.1-03 Ineligible Projects, co-op rows (08/05/2026) [verified primary, read 2026-08-13]; New York rent-regulated sponsor carve-out sits here since B4-2.3-05 was deleted by SEL-2025-06 (06 Aug 2025)
COOP-14-TAX-ABATEMENT
Corporate real estate tax abatements
N/A co-op standard, not applied to a condominium file Form 1074 Request For Cooperative Project Information (footer 'July 96') [verified primary, read 2026-08-13]; optional by its own instructions: 'We do not require the use of this form'
COOP-15-FLIP-TAX
Flip tax / stock transfer fee
N/A co-op standard, not applied to a condominium file B4-2.3-04 Loan Eligibility for Co-op Share Loans (08/06/2025) [verified primary, read 2026-08-13]
COOP-16-LAND-LEASE
Land ownership and ground lease
N/A co-op standard, not applied to a condominium file B4-2.1-03 Ineligible Projects, co-op rows (08/05/2026) [verified primary, read 2026-08-13]; New York rent-regulated sponsor carve-out sits here since B4-2.3-05 was deleted by SEL-2025-06 (06 Aug 2025)
COOP-17-TYPE-AND-PERS
Co-op type and PERS routing
N/A co-op standard, not applied to a condominium file B4-2.1-03 Ineligible Projects, co-op rows (08/05/2026) [verified primary, read 2026-08-13]; New York rent-regulated sponsor carve-out sits here since B4-2.3-05 was deleted by SEL-2025-06 (06 Aug 2025)
COOP-18-DELINQUENCY-BASIS
Delinquency counting basis
N/A co-op standard, not applied to a condominium file B4-2.3-02 Co-op Project Eligibility (05/06/2026) [verified primary, read 2026-08-13]
COOP-19-OCCUPANCY
Occupancy grid
N/A co-op standard, not applied to a condominium file Form 1074 Request For Cooperative Project Information (footer 'July 96') [verified primary, read 2026-08-13]; optional by its own instructions: 'We do not require the use of this form'

The other examples, Findings, Blocked, Co-op. Or all four at a glance.

Judge it on your own building

The first package is free. Send one community’s documents and compare what comes back with what you would have written yourself.